Solar built for Happy Valley homes, designed by a local team, permitted through Clackamas County, and installed in 1–2 days on the roof.
Happy Valley sits in Clackamas County and is served by PGE. So are we. Sunward Power is headquartered at 14765 SE 82nd Dr in Clackamas, minutes from Happy Valley. Going solar here works the way it should: we design your system, pull the Clackamas County permit, and file the PGE interconnection paperwork. You approve the plan and flip the switch about eight weeks later. Oregon solar incentives come straight off the project cost.
The crew that designs, permits, and installs your system works out of our Clackamas shop, not a call center three states away.
Oregon credits every kilowatt-hour you send to the grid one-to-one. Sunny-season surplus banks credits you spend in the darker months.




Three steps and roughly eight weeks separate the first call from your first solar kilowatt-hour.
We walk your roof and your usage history, then tell you exactly what to expect.
Engineering, the Clackamas County permit, and PGE interconnection paperwork are all on us.
1–2 days of install work, then inspection and utility sign-off, coordinated by our office.
"Great service! Answered all my questions. Crew installing was very professional and friendly. Cleaned up afterwards. I would highly recommend Sunward Power."
★★★★★ 5.0 on Google · 56 reviews · Read more reviews →
One visit, one real production estimate, and a plain answer on whether solar pencils out for your home, with no pressure either way.