OREGON SOLAR INCENTIVES ARE STILL AVAILABLE IN 2026   See what you qualify for
Portland · Multnomah County · CCB #238152

Solar panel installation in Portland, Oregon

Rooftop solar for Portland homes, designed and installed by one local crew, with Multnomah County permits and PGE paperwork included. Most installs done in 1–2 days.

Solar in Portland

Multnomah County permits, PGE net metering, one local crew.

If you own a home in Portland, you're in Multnomah County and PGE territory. That combination means two things for solar: your permit runs through the Multnomah County jurisdiction, and Oregon's net metering lets your meter run both ways with PGE. We design and install residential systems across the city with our own crews, and Oregon solar incentives still come off the top.

Rooftop solar installation on an Oregon home
Recent installs

Recent work on Portland roofs.

Photo of a Portland install

Neighborhood rooftop array

Multnomah County · kW system · installed year

Photo of a Portland install

Neighborhood home install

Multnomah County · kW system · installed year

See all projects

The plan

Three steps between you and your own power.

Most Portland projects finish in about eight weeks, first call to power-on.

1

Free evaluation

We assess your roof, shading, and usage, then give you a real number, not a sales pitch.

2

Design & permits

Engineering, the Multnomah County permit, and the PGE interconnection paperwork. All handled by us.

3

Install & power on

Our crew is on your roof 1–2 days. We coordinate inspection and the utility's final sign-off.

★★★★★

"Permits were pulled with the City of Portland, and application was sent to PGE for a new Bidirectional "smart" Meter. Installation was completed in 1 day and went smoothly."

Jeff Google review · June 2025
Portland questions

What Portland homeowners ask us first.

We do. The Multnomah County permit is part of the job, not an add-on. We prepare it, file it, and walk it through, along with your PGE interconnection application.
Oregon's net metering credits you one-to-one: every kilowatt-hour your panels send to the grid offsets one you buy. Your meter literally runs both ways, and summer surplus banks against winter bills.
About eight weeks end to end, and most of that is permitting and utility scheduling. The crew is only on your roof for 1–2 days.

See everywhere we install →

Free site evaluation

Schedule your free Portland site evaluation.

A 30-minute visit, a real production estimate for your roof, and a straight answer on whether solar pencils out, even if that answer is "not yet."